Events unfold on the construction of the Baikal-Amur Mainline (BAM), in the survey party and in the village of Kamushki, through which the highway is to pass.
1982
70
User Score
(01/01/1982) (SU)
Drama,
0h 0m
Overview
Events unfold on the construction of the Baikal-Amur Mainline (BAM), in the survey party and in the village of Kamushki, through which the highway is to pass.