The chief engineer proposes to make changes to the design of the polar hydroelectric power station by abandoning the construction of the tunnel due to a collapse.
1986
NA
User Score
(10/27/1986) (SU)
Drama, TV Movie,
0h 0m
Overview
The chief engineer proposes to make changes to the design of the polar hydroelectric power station by abandoning the construction of the tunnel due to a collapse.